← Back to status

Status / Incidents / Required Infrastructure Restart

Required Infrastructure Restart

Resolved

Started 30.09.2026, 10:18 MESZ · Resolved 30.09.2026, 10:32 MESZ · 5 days ago

Impact: NONE

As the restart originally scheduled for September 16, 2026 could not be carried out, we unfortunately need to perform the outstanding restarts on short notice and with immediate effect. During this maintenance, downtime will occur on the affected nodes and the customer systems running on them. We expect a maximum downtime of approximately 15 minutes per node and will coordinate and complete the restarts as efficiently as possible. We apologize for the short-notice interruption and will provide further updates as the maintenance progresses.

AffectedRyzen FC ClusterRyzen Zen 4Ryzen Zen 5xeon02xeon01Xeon FC Clusterindex-hosting.comControl PanelAPIDedicated Control PanelBackendIPMI VPN

Updates

  1. Resolved

    The scheduled restart has been completed successfully. All affected nodes are back online and all VMs are running normally again. We will continue monitoring the systems to ensure everything remains stable following the maintenance. The maintenance is now complete.

    Posted 5 days ago · 30.09.2026, 10:32 MESZ · Administrator · latest

  2. Investigating

    As the restart originally scheduled for September 16, 2026 could not be carried out, we unfortunately need to perform the outstanding restarts on short notice and with immediate effect. During this maintenance, downtime will occur on the affected nodes and the customer systems running on them. We expect a maximum downtime of approximately 15 minutes per node and will coordinate and complete the restarts as efficiently as possible. We apologize for the short-notice interruption and will provide further updates as the maintenance progresses.

    Posted 5 days ago · 30.09.2026, 10:19 MESZ · Administrator